• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 34. Outlet Manifold.
Figure 36. Valve Bank Lines.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  213    214    215    216    217  218  219    220    221    222    223  
img
.
TM 5-2410-240-23-3
0196
INSTALLATION
000196
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Failure to follow this warning may result in death or injury to
personnel.
WARN I N G
Hydraulic oil is very slippery. Immediately wipe up any spills. Failure to follow this warning
may result in injury to personnel.
N OT E
Install fittings as noted during removal.
Valve bank weighs approximately 97 lb (44 kg).
1. With assistance, install valve bank (Figure 35, Item 5), washer (Figure 35, Item 4), and bolt (Figure 35, Item 3)
on machine.
2. Install two washers (Figure 35, Item 2) and bolts (Figure 35, Item 1) on valve bank (Figure 35, Item 5).
Figure 35. Valve Bank Assembly.
0196
0196-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.