Figure 39. Hydraulic Tank Supply Hoses.
VALVE BANK 3 SERVICE (WITH WINCH)

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  218    219    220    221    222  223  224    225    226    227    228  
img
. .
TM 5-2410-240-23-3
0196
INSTALLATION CONTINUED
13. Install plate (Figure 41, Item 1), four washers (Figure 41, Item 2), and bolts (Figure 41, Item 3) on machine.
Figure 41. Bottom Rear Plate.
0196
END OF TASK
FOLLOW-ON TASKS
000196
1. Install rear floor plate (WP 0206).
2. Fill hydraulic fluid (WP 0160).
3. Verify correct operation of machine (TM 5-2410-240-10).
4. Install rear and middle bottom guards (WP 0156).
END OF TASK
END OF WORK PACKAGE
0196-33/(34 blank)