• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Pressure Gauge.
Figure 9. Pressure Cutoff.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  989    990    991    992    993  994  995    996    997    998    999  
img
.
TM 5-2410-241-23-1
0033
IMPLEMENT PUMP DISCHARGE TESTS CONTINUED
High Pressure Cutoff Test - Continued
0033
47. Ensure all implements are lowered to the ground (TM 5-2410-241-10).
48. Release hydraulic system pressure (WP 0186).
49. Turn ignition switch and battery disconnect switch to OFF position. (TM 5-2410-241-10).
50. Hold adjustment screw (Figure 8, Item 2) and loosen nut (Figure 8, Item 1) on pump control valve (Figure 8,
Item 3).
51. If high pressure cutoff is high, turn adjustment screw (Figure 8, Item 2) counterclockwise to decrease margin
pressure.
52. If high pressure cutoff is low, turn adjustment screw (Figure 8, Item 2) clockwise to increase margin pressure.
53. Hold adjustment screw (Figure 8, Item 2) and tighten nut (Figure 8, Item 1) on pump control valve (Figure 8,
Item 3). Tighten nut to 144 in-lb (16 Nm).
Figure 8. Pressure Compensator Adjustment.
0033
0033-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.