• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Test Equipment Installation.
Figure 6. Differential Pressure Gauge.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  986    987    988    989    990  991  992    993    994    995    996  
img
.
TM 5-2410-241-23-1
0033
IMPLEMENT PUMP DISCHARGE TESTS CONTINUED
Margin Pressure Test and Adjustment - Continued
0033
22. Ensure all implements are lowered to the ground (TM 5-2410-241-10).
23. Release hydraulic system pressure (WP 0186).
24. Turn ignition switch and battery disconnect switch to OFF position (TM 5-2410-241-10).
25. Remove front floor plate (WP 0230).
26. Hold adjustment screw (Figure 5, Item 2) and loosen nut (Figure 5, Item 1) on pump control valve (Figure 5,
Item 3).
27. If margin pressure is high, turn adjustment screw (Figure 5, Item 2) counterclockwise to decrease margin
pressure.
28. If margin pressure is low, turn adjustment screw (Figure 5, Item 2) clockwise to increase margin pressure.
29. Hold adjustment screw (Figure 5, Item 2) and tighten nut (Figure 5, Item 1) on pump control valve (Figure 5,
Item 3). Tighten nut to 144 lb-in. (16 Nm).
Figure 5. Flow Compensator Adjustment.
0033
0033-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.