10
TM 5-2410-241-23-1
FIELD MAINTENANCE
-
IMPLEMENT PUMP DISCHARGE TESTS AND ADJUSTMENTS
00
33
INITIAL SETUP
Tools and Special Tools
Personnel Required
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0302, Item 65)
0
References
0
Gauge, Pressure (Pilot), Dial Indicating
WP 0186
(WP 0302, Item 31)
0
0
WP 0230
Gauge Kit, Pressure, Dial Indicating (WP
0
0302, Item 28)
0
Equipment Condition
0
177-7862 Hose Assembly; 6,000 psi (41,500
Machine parked (TM 5-2410-241-10)
kPa), 1/8-27-NPTF, 18 ft (549 cm) long
0
Hydraulic system pressure released (WP
(WP 0302, Item 34)
0
0186)
177-7861 Hose Assembly, Non-Metallic;
0
6,000 psi (41,500 kPa) 1/8-27-NPTF, 14 ft
Estimated Time to Complete
0
(427 cm) long (Part of Gauge, Pressure,
1.6 Hr
Dial Indicating Kit [1U5796])
0
(WP 0302, Item 35)
0
Wrench, Torque, Dial, 3/8" Drive, 300 lb-in.
(WP 0302, Item 74)
0
Materials/Parts
0
Rag, Wiping (WP 0303, Item 24)
0
O-ring (2)
0
0033-1