• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IMPLEMENT PUMP DISCHARGE TESTS AND ADJUSTMENTS
Figure 2. Test Equipment Installation.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  982    983    984    985    986  987  988    989    990    991    992  
img
.
TM 5-2410-241-23-1
0033
IMPLEMENT PUMP DISCHARGE TESTS
0033
Low Pressure Standby Pressure Test
0033
1. Install 177-7862 hose (Figure 1, Item 3) and 177-7861 hose (Figure 1, Item 4) on 1U5793 pressure differential
gauge (Figure 1, Item 2).
2. Install 8T0856 pressure gauge (Figure 1, Item 1) on 1U5793 pressure differential gauge (Figure 1, Item 2).
Figure 1. Test Equipment.
0033
0033-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.