• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Alternator Cable.
Figure 8. Fuse Panel Alternator Cable.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  912    913    914    915    916  917  918    919    920    921    922  
img
.
TM 5-2410-241-23-2
0163
INSTALLATION CONTINUED
N OT E
Install electrical connections and cable as noted during removal.
6. Position alternator cable (Figure 7, Item 4) on machine.
7. Install two clamps (Figure 7, Item 5), washers (Figure 7, Item 7), and nuts (Figure 7, Item 6) on alternator cable
(Figure 7, Item 4).
8. Install two clamps (Figure 7, Item 1), washers (Figure 7, Item 3), and nuts (Figure 7, Item 2) on alternator cable
(Figure 7, Item 4) and starter cable (Figure 7, Item 8).
Figure 7. Alternator Cable to Chassis.
0163
0163-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.