• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Fuse Panel Alternator Cable.
Figure 10. Clamps.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  914    915    916    917    918  919  920    921    922    923    924  
img
.
TM 5-2410-241-23-2
0163
INSTALLATION CONTINUED
N OT E
Install electrical connections and cable as noted during removal.
11. Install cover (Figure 9, Item 1), two washers (Figure 9, Item 3), and bolts (Figure 9, Item 2) on fuse panel
(Figure 9, Item 9).
12. Install two clamps (Figure 9, Item 6), washers (Figure 9, Item 4), and nuts (Figure 9, Item 5) on alternator cable
(Figure 9, Item 7) and fuse panel cable (Figure 9, Item 8).
Figure 9. Cover.
0163
0163-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.