8
TM 5-2410-241-23-2
FIELD MAINTENANCE
-
STARTER POWER CABLE REPLACEMENT
016
4
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 65)
Front floor plates removed (WP 0230)
0
0
Gloves, Rubber (S0208)
Battery disconnect switch to OFF (TM 5-2410-
(WP 0302, Item 68)
241-10)
0
0
Goggles (S0209)
Engine enclosure left door guard removed
(WP 0302, Item 68)
(WP 0202)
0
0
Materials/Parts
Drawing Required
0
0
Rag, Wiping (WP 0303, Item 24)
TM 5-2410-241-24P, Figure 96
0
0
Tag, Marker (WP 0303, Item 34)
0
Estimated Time to Complete
0
Tiedown Strap (WP 0303, Item 36)
0
3.5 Hr
0
References
0
WP 0295
0
0164-1