INSTALLATION
000210
1. Install four mounts (Figure 9, Item 5), washers (Figure 9, Item 4), and nuts (Figure 9, Item 3) on cylinder
brackets (Figure 9, Item 2).
2. If removed, install guard (Figure 9, Item 1), four washers (Figure 9, Item 7), and nuts (Figure 9, Item 8) on
cylinder brackets (Figure 9, Item 2).
N OT E
Route harness as noted during removal.
3. Route wiring harness (Figure 9, Item 9) and install two new tiedown straps (Figure 9, Item 6) on cylinder
brackets (Figure 9, Item 2).
Figure 9. Guard.