TM 5-2410-241-23-3
FIELD MAINTENANCE
-
VALVE BANK GP - TEST 5 SERVICE WITH RIPPER
0211
EFFECTIVITY NOTICE (WITH RIPPER)
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
References
0
0
Bracket, Link (3/8 in.; 2,250 lb [1,000 kg]) (WP
0
0
Gloves, Rubber (S0208)
0
Equipment Condition
0
0
0
Machine parked (TM 5-2410-241-10)
0
Wrench, Combination, 1-1/8" (S0788)
0
0
Wrench, Torque, Click, Ratcheting, 3/8" Drive,
0
0
0
Hydraulic system pressure released
Wrench, Torque, Dial, 3/8" Drive, 300 lb-in.
(WP 0186)
0
0
Hydraulic system drained (WP 0184)
Lifting Device (500-lb capacity)
0
0
Drawing Required
Materials/Parts
0
0
0
0
Estimated Time to Complete
0
0
12.5 Hr
0
0
Cotter Pin (2)
0
O-ring (79)
0
0211-1