• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Control Lever Linkage.
Figure 6. Control Valve Mounting.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  213    214    215    216    217  218  219    220    221    222    223  
img
.
TM 5-2410-241-23-3
0211
REMOVAL CONTINUED
N OT E
Care must be taken to ensure that fluidsare contained during performance of inspection,
maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid
with suitable containers before opening any compartment or disassembling any
component containing fluids.
Dispose of all fluids accordingto local regulations and mandates.
Perform disassembly on a clean surface.
Clean exterior of component to prevent contamination.
Plug all lines, hoses and tubes to prevent contamination and leaks.
Tag and mark all hoses and lines to aid installation.
9. Remove four bolts (Figure 5, Item 4), washers (Figure 5, Item 3), flange (Figure 5, Item 1), and hose (Figure 5,
Item 6) from control valve (Figure 5, Item 2).
10. Remove O-ring (Figure 5, Item 5) from hose (Figure 5, Item 6). Discard O-ring.
Figure 5. Front Side Hose.
0211
0211-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.