• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Bracket.
BANK GP - TEST 5 SERVICE WITH RIPPER EFFECTIVITY NOTICE (WITH RIPPER)

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  207    208    209    210    211  212  213    214    215    216    217  
img
.
TM 5-2410-241-23-3
0210
INSTALLATION CONTINUED
5. Install flood lamp (Figure 11, Item 3), washer (Figure 11, Item 2), and bolt (Figure 11, Item 1) on guard
(Figure 11, Item 5).
N OT E
Install electrical connector as tagged during removal.
6. Connect electrical connector (Figure 11, Item 4).
Figure 11. Flood Lamp Assembly.
0210
END OF TASK
FOLLOW-ON TASKS
000210
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0210-11/(12 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.