• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PRIME PUMP TOGGLE SWITCH ASSEMBLY REPLACEMENT
Figure 3. Left Engine Door.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  303    304    305    306    307  308  309    310    311    312    313  
img
.
TM 5-2410-240-23-2
0071
REMOVAL CONTINUED
N OT E
Tag wires and wiring harnesses to aid installation.
Note position of tiedown straps to aid installation.
2. Remove two tiedown straps (Figure 2, Items 6 and 9) from harness (Figure 2, Item 7). Discard tiedown straps.
3. Disconnect connector (Figure 2, Item 8) and position harness (Figure 2, Item 7) aside.
4. Remove nut (Figure 2, Item 4), washer (Figure 2, Item 3), identification tag (Figure 2, Item 5), and switch
(Figure 2, Item 2) from base (Figure 2, Item 1).
Figure 2. Prime Pump Toggle Switch Assembly.
0071
END OF TASK
CLEANING AND INSPECTION
00071
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
0071-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.