• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PUMP COUPLING REPLACEMENT
Figure 3. Flywheel.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  474    475    476    477    478  479  480    481    482    483    484  
img
.
TM 5-2410-240-23-2
0096
PUMP COUPLINGPUMP REMOVAL
00096
N OT E
Note position of coupling to aid installation.
Remove two set screws (Figure 2, Item 1) and coupling (Figure 2, Item 2) from pump shaft (Figure 2, Item 3).
END OF TASK
CLEANING AND INSPECTION
00096
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
PUMP COUPLINGPUMP INSTALLATION
00096
N OT E
Install coupling as noted during removal.
Install coupling (Figure 2, Item 2) on pump shaft (Figure 2, Item 3) until shaft engages spring clip retainer (Figure 2,
item 4). Tighten set screws (Figure 2, Item 1) to 52 lb-ft (70 Nm).
Figure 2. Pump.
0096
END OF TASK
0096-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.