• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. Cylinder Head Tightening Sequence.
Figure 18. Front of Cylinder Head.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  532    533    534    535    536  537  538    539    540    541    542  
img
.
TM 5-2410-240-23-2
0103
INSTALLATION CONTINUED
12. Install six heater plugs (Figure 16, Item 1) on cylinder head (Figure 16, Item 2).
Figure 16. Heater Plugs.
0103
13. Apply O-ring assembly compound to two new O-rings (Figure 17, Item 5).
14. Install bypass tube assembly (Figure 17, Item 2) and O-ring (Figure 17, Item 5) on cylinder head (Figure 17,
Item 4).
15. Install bypass tube (Figure 17, Item 2), O-ring (Figure 17, Item 5), and two bolts (Figure 17, Item 3) on front
housing (Figure 17, Item 1). Tighten bolts to 16 lb-ft (22 Nm).
16. Install hose and clamp on cylinder head. Tighten clamp.
Figure 17. Bypass Tube.
0103
0103-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.