• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 22. Fuel Lines.
VALVE COVER, GASKET, AND BASE REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  537    538    539    540    541  542  543    544    545    546    547  
img
. . . . . . . . . . . . . . .
TM 5-2410-240-23-2
0103
FOLLOW-ON TASKS
000103
1. Install all fuel injectors (WP 0078).
2. Install valve cover and base (WP 0104).
3. Install fuel rail (WP 0062).
4. Install engine ECM and bracket (WP 0049).
5. Install inlet manifold (WP 0088).
6. Install secondary fuel filter base (Figure WP 0064).
7. Install exhaust manifold (WP 0081).
8. Install upper exhaust hose (WP 0041).
9. Install coolant temperature sensor (WP 0056).
10. Install air pressure sensor (WP 0055).
11. Install air intake temperature sensor (WP 0054).
12. Install water temperature regulator (WP 0082).
13. Install muffler and bracket (WP 0045).
14. Install fuel prime pump and base (WP 0068).
15. Install right engine access panel (WP 0182).
16. Install left engine access panel (WP 0184).
17. Install hood (WP 0186).
18. Refill engine coolant (WP 0043).
19. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0103-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.