• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Sprocket Alignment.
TRACK SERVICE

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  600    601    602    603    604  605  606    607    608    609    610  
img
. . .
TM 5-2410-240-23-2
0111
INSTALLATION CONTINUED
000111
3. Install 27 bolts (Figure 3, Item 2), nuts (Figure 3, Item 1), and sprocket (Figure 3, Item 3) on final drive unit
(Figure 3, Item 4). Torque nuts to 127 lb-ft (172 Nm) plus an additional 1/3 turn.
Figure 3. Sprocket.
0111
END OF TASK
FOLLOW-ON TASKS
000111
1. Install sprocket guard (WP 0113).
2. Connect track (WP 0112).
3. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0111-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.