TM 5-2410-240-23-2
0134
INSTALLATION CONTINUED
N OT E
Install electrical connectors and tiedown straps as noted during removal.
22. Connect harness (Figure 22, Item 4) on solenoid (Figure 22, Item 3).
23. Install new tiedown strap (Figure 22, Item 5) on harness (Figure 22, Item 4) and solenoid (Figure 22, Item 3).
24. Install new tiedown straps (Figure 22, Item 2) on harness (Figure 22, Item 4) and pump support (Figure 22,
Item 1).
Figure 22. Solenoid, Harness, and Retaining Hardware on Pump Support.
0134