• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HORN REPLACEMENT
LOCKOUT SWITCH REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  849    850    851    852    853  854  855    856    857    858    859  
img
.
TM 5-2410-240-23-2
0139
CLEANING AND INSPECTION
000139
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000139
1. Install horn (Figure 2, Item 1), washer (Figure 2, Item 3), and bolt (Figure 2, Item 2) on bracket (Figure 2,
Item 4).
N OT E
Install electrical connector as noted during removal.
2. Connect harness connector (Figure 2, Item 5) to horn (Figure 2, Item 1).
Figure 2. Horn and Retaining Hardware.
0139
3. Close and latch upper radiator grill (TM 5-2410-240-10).
END OF TASK
FOLLOW-ON TASKS
000139
Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0139-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.