TM 5-2410-240-23-2
0155
INSTALLATION CONTINUED
27. Install clamp (Figure 24, Item 2) on platform harness (Figure 24, Item 1).
28. Install clamp (Figure 24, Item 2), washer (Figure 24, Item 4), and bolt (Figure 24, Item 3) on machine
(Figure 24, Item 5).
Figure 24. Harness Retaining Hardware Above Junction Box.
0155
N OT E
Install electrical connectors as noted during removal.
29. Connect platform harness (Figure 25, Item 3) to cab harness (Figure 25, Item 1) and tighten screw (Figure 25,
Item 2).
Figure 25. Harness Connectors Near Left Top of Machine ECM.
0155