• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Harness Ground Connectors Underneath Cab Floor.
Figure 19. Harness Retaining Hardware Below Air Filter.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1051    1052    1053    1054    1055  1056  1057    1058    1059    1060    1061  
img
.
TM 5-2410-240-23-2
0155
INSTALLATION CONTINUED
N OT E
Install tiedown straps as noted during removal.
11. Install clamp (Figure 18, Item 5) on platform harness (Figure 18, Item 9).
12. Install clamp (Figure 18, Item 5), washer (Figure 18, Item 7), and bolt (Figure 18, Item 6) on machine
(Figure 18, Item 8).
13. Install two washers (Figure 18, Item 4) and bolts (Figure 18, Item 2) on HVAC duct (Figure 18, Item 3).
14. Install new tiedown straps (Figure 18, Item 1) on clips (Figure 18, Item 11), tube (Figure 18, Item 10), and
platform harness (Figure 18, Item 9).
Figure 18. Harness Retaining Hardware Near HVAC Housing.
0155
0155-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.