Figure 12. Harness Connectors and Retaining Hardware Underneath Cab Floor.
Figure 14. Harness Connectors and Retaining Hardware Underneath Cab Floor.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1047    1048    1049    1050    1051  1052  1053    1054    1055    1056    1057  
img
.
TM 5-2410-240-23-2
0155
REMOVAL CONTINUED
N OT E
Note location of tiedown straps and tag and mark electrical connectors to aid installation.
30. Disconnect three relays (Figure 13, Item 1) from platform harness (Figure 13, Item 5).
31. Remove three relays (Figure 13, Item 1) from brackets (Figure 13, Item 2).
32. Remove tiedown straps (Figure 13, Item 4) from platform harness (Figure 13, Item 5) and from clips
(Figure 13, Item 3). Discard tiedown straps.
N OT E
Assistance is required to pass platform harness and connectors between HVAC duct and
machine.
Note routing of platform harness to aid installation.
33. Remove platform harness (Figure 13, Item 5) from machine (Figure 13, Item 6).
Figure 13. Harness Connectors and Retaining Hardware Underneath Cab Floor.
0155
END OF TASK
CLEANING AND INSPECTION
000155
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK