• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Harness Connectors and Retaining Hardware Underneath Cab Floor.
Figure 15. Harness Connectors and Retaining Hardware Underneath Cab Floor.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1048    1049    1050    1051    1052  1053  1054    1055    1056    1057    1058  
img
.
TM 5-2410-240-23-2
0155
INSTALLATION
000155
Assistance is required to pass platform harness and connectors between HVAC duct and
machine.
Install platform harness as noted during removal.
1. Install platform harness (Figure 14, Item 5) on machine (Figure 14, Item 6).
N OT E
Install tiedown straps and electrical connectors as noted during removal.
2. Install new tiedown straps (Figure 14, Item 4) on clips (Figure 14, Item 3) and platform harness (Figure 14,
Item 5).
3. Connect three relays (Figure 14, Item 1) to platform harness (Figure 14, Item 5).
4. Install three relays (Figure 14, Item 1) on brackets (Figure 14, Item 2).
Figure 14. Harness Connectors and Retaining Hardware Underneath Cab Floor.
0155
0155-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.