TM 5-2410-240-23-2
0155
INSTALLATION CONTINUED
N OT E
Install tiedown straps and electrical connectors as noted during removal.
19. Install new tiedown straps (Figure 20, Item 4) on clips (Figure 20, Item 5) and platform harness (Figure 20,
Item 2).
20. Install new tiedown straps (Figure 20, Item 3) on bracket (Figure 20, Item 1) and platform harness
(Figure 20, Item 2).
21. Connect two harness connectors (Figure 20, Item 8) to machine ECM (Figure 20, Item 6) and tighten screws
(Figure 20, Item 7).
Figure 20. Machine ECM Harness Connectors and Harness Retaining Hardware.
0155