TM 5-2410-240-23-2
0155
INSTALLATION CONTINUED
N OT E
Install tiedown straps and electrical connectors as noted during removal.
22. Connect harness connector (Figure 21, Item 3) to platform harness (Figure 21, Item 4).
23. Connect and lock platform harness (Figure 21, Item 4) to winch solenoid harness (Figure 21, Item 1).
24. Install new tiedown strap (Figure 21, Item 2) on platform harness (Figure 21, Item 4) and winch solenoid
harness (Figure 21, Item 1).
Figure 21. Harness Connector Near Junction Box.
0155