• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Harness Retaining Hardware Near HVAC Housing.
Figure 20. Machine ECM Harness Connectors and Harness Retaining Hardware.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1052    1053    1054    1055    1056  1057  1058    1059    1060    1061    1062  
img
.
TM 5-2410-240-23-2
0155
INSTALLATION CONTINUED
N OT E
Install tiedown straps and electrical connectors as noted during removal.
15. Connect and lock connector cap (Figure 19, Item 5) to platform harness connector (Figure 19, Item 7).
16. Install clamp (Figure 19, Item 11) on platform harness (Figure 19, Item 1).
17. Install spacer (Figure 19, Item 9), bracket (Figure 19, Item 10), clamp (Figure 19, Item 11), washer (Figure 19,
Item 3), and bolt (Figure 19, Item 2) on bracket (Figure 19, Item 8).
18. Install new tiedown strap (Figure 19, Item 4) on clip (Figure 19, Item 6) and three platform harness connectors
(Figure 19, Item 7).
Figure 19. Harness Retaining Hardware Below Air Filter.
0155
0155-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.