TM 5-2410-240-23-2
0155
INSTALLATION CONTINUED
N OT E
Install electrical connectors as noted during removal.
9. Install four harness ground connectors (Figure 16, Item 4), washer (Figure 16, Item 2), and bolt (Figure 16,
Item 1) on machine (Figure 16, Item 3).
Figure 16. Harness Ground Connectors Underneath Cab Floor.
0155
10. Install platform harness (Figure 17, Item 1) though opening (Figure 17, Item 2).
Figure 17. Harness at Lower Left Door Hinge Area.
0155