• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Hydraulic Tank to Pump Hose.
Figure 3. Pump to Valve Bank Hoses.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1242    1243    1244    1245    1246  1247  1248    1249    1250    1251    1252  
img
.
TM 5-2410-240-23-2
0171
HOSES REMOVAL CONTINUED
N OT E
Note routing of hose to aid installation.
2. Disconnect hose (Figure 2, Item 5) and remove O-ring (Figure 2, Item 7) from hydraulic tank (Figure 2, Item 1).
Discard O-ring.
3. Remove check valve (Figure 2, item 6) and O-ring (Figure 2, Item 7) from hydraulic tank (Figure 2, Item 1).
Discard O-ring.
4. Disconnect hose (Figure 2, Item 5), remove O-ring (Figure 2, Item 3) from valve bank (Figure 2, Item 4), and
remove hose (Figure 2, Item 5) from machine. Discard O-ring.
5. Remove connector (Figure 2, Item 2) and O-ring (Figure 2, Item 3) from valve bank (Figure 2, Item 4). Discard
O-ring.
Figure 2. Tank to Valve Bank Hose.
0171
0171-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.