Figure 2. Tank to Valve Bank Hose.
Figure 4. Pump to Demand Fan Manifold.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1243    1244    1245    1246    1247  1248  1249    1250    1251    1252    1253  
img
.
TM 5-2410-240-23-2
0171
HOSES REMOVAL CONTINUED
N OT E
Note routing of hoses and fittings to aid installation.
6. Disconnect two hoses (Figure 3, Item 3) and remove two O-rings (Figure 3, Item 1) from pump (Figure 3,
Item 2). Discard O-rings.
7. Disconnect two hoses (Figure 3, Item 3) and remove two O-rings (Figure 3, Item 4) from two connectors
(Figure 3, Item 6). Discard O-rings.
8. Remove two connectors (Figure 3, Item 6) and two O-rings (Figure 3, Item 4) from valve bank (Figure 3,
Item 5). Discard O-rings.
Figure 3. Pump to Valve Bank Hoses.