TM 5-2410-240-23-2
0172
LEFT SIDE LIFT TUBES INSTALLATION
000172
1. Position two left side lift tubes (Figure 12, Item 3) on machine and remove caps.
2. Install two new O-rings (Figure 12, Item 2) on two right side lift tubes (Figure 12, Item 1), and connect two left
side lift tubes (Figure 12, Item 3) on two right side lift tubes (Figure 12, Item 1).
Figure 12. Tube Fitting.
0172
3. Position hose (Figure 13, Item 4) on machine and install bracket (Figure 13, Item 1), washer (Figure 13,
Item 2), and bolt (Figure 13, Item 3) on machine.
D6K-2216
Figure 13. Bracket and Clamp.
0172