Figure 18. Valve Solenoid Cover.
Figure 20. Solenoids.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  235    236    237    238    239  240  241    242    243    244    245  
img
.
TM 5-2410-240-23-3
0197
ASSEMBLY CONTINUED
C AU T I O N
Install valves in correct order as noted during disassembly. Failure to follow this caution
may cause damage to equipment.
N OT E
Install O-rings as noted during removal.
7. Install six new O-rings (Figure 19, Item 3) on blade lift control valve (Figure 19, Item 5).
N OT E
Install O-rings as noted during removal.
8. Install two fittings (Figure 19, Item 1) and four new O-rings (Figure 19, Item 2) on blade lift control valve
(Figure 19, Item 5).
9. Install blade lift control valve (Figure 19, Item 5) on bolts (Figure 19, Item 4).
Figure 19. Blade Lift Control Valve.
0197
0197-17