• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER CONVERTER REPLACEMENT
WINCH OPERATION CONTROL HANDLE REPLACEMENT

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  388    389    390    391    392  393  394    395    396    397    398  
img
. .
TM 5-2410-240-23-3
0216
CLEANING AND INSPECTION
000216
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000216
N OT E
Install electrical connector as noted during removal.
1. Install power converter (Figure 2, Item 1), two washers (Figure 2, Item 4), and bolts (Figure 2, Item 3) on
machine.
2. Connect electrical connector (Figure 2, Item 2) on power converter (Figure 2, Item 1).
Figure 2. Power Converter.
0216
END OF TASK
FOLLOW-ON TASKS
000216
Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0216-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.