• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STARTING SYSTEM TESTS
STARTING SYSTEM TESTS

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  953    954    955    956    957  958  959    960    961    962    963  
img
.
TM 5-2410-241-23-1
0031
STARTING SYSTEM TESTS
00031
Test Step 1. Measure Voltage of Battery
00031
N OT E
Do not measure voltage across cable post clamps.
1. Release latch (Figure 1, Item 1) and open battery box door (Figure 1, Item 2) on machine.
2. Lift protective boot (Figure 1, Item 6) from negative battery terminal (Figure 1, Item 5).
3. Lift protective boot (Figure 1, Item 4) from positive battery terminal (Figure 1, Item 3).
4. Using a digital multimeter, measure voltage between the positive (Figure 1, Item 3) and negative (Figure 1,
Item 5) battery posts while cranking engine or attempting to crank engine.
a. If voltage is 17 to 26 volts, proceed to Test Step 2.
b. If battery voltage is less than 17 volts, continue diagnostics.
Figure 1. Battery Test Points.
0031
0031-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.