• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Harness Connector A-C1 and MA-C3.
IMPLEMENT CYLINDER TESTS

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  959    960    961    962    963  964  965    966    967    968    969  
img
.
TM 5-2410-241-23-1
0031
STARTING SYSTEM TESTS CONTINUED
9. Remove fuse box (Figure 6, Item 8) from machine (WP 0176).
10. Remove nut (Figure 6, Item 6), eyelet (Figure 6, Item 4), and washer (Figure 6, Item 7) from starter relay
(Figure 6, Item 5).
11. Monitor and record the digital multimeter and measure resistance between fuse box harness connector A-C1
terminal 6 (Figure 6, Item 3) and eyelet (Figure 6, Item 4).
12. Monitor and record the digital multimeter and measure resistance between fuse box harness connector A-C1
terminal 7 (Figure 6, Item 2) and eyelet (Figure 6, Item 4).
13. Monitor and record the digital multimeter and measure resistance between fuse box harness connector A-C1
terminal 8 (Figure 6, Item 1) and eyelet (Figure 6, Item 4).
a. If resistance is 5.0 ohms or greater for any measurement, replace fuse box wiring harness (WP 0176).
b. If resistance is less than 5.0 ohms for all measurements, replace starter relay (WP 0176).
Figure 6. Harness Connector A-C1 and Starter Relay.
0031
END OF TASK
END OF WORK PACKAGE
0031-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.