• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Test Equipment.
Figure 3. Front Lift Cylinder.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  962    963    964    965    966  967  968    969    970    971    972  
img
.
TM 5-2410-241-23-1
0032
BLADE LIFT CYLINDER PRESSURE TEST CONTINUED
3. Open door (Figure 2, Item 2) (TM 5-2410-241-10).
N OT E
Transmission filter shown removed for clarity.
4. Remove protective cap (Figure 2, Item 3) from fitting (Figure 2, Item 6).
5. Remove protective cap (Figure 2, Item 4) from fitting (Figure 2, Item 5).
6. Connect 177-7861 hose (Figure 2, Item 8) coming from implement pump discharge pressure port (Figure 2,
Item 9) to fitting (Figure 2, Item 6).
7. Connect 177-7862 hose (Figure 2, Item 7) coming from signal pressure port (Figure 2, Item 1) to fitting
(Figure 2, Item 5).
Figure 2. Test Equipment Installation.
0032
0032-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.