• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Test Equipment.
Figure 8. Test Equipment Installation.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  967    968    969    970    971  972  973    974    975    976    977  
img
.
TM 5-2410-241-23-1
0032
BLADE TILT CYLINDER PRESSURE TEST CONTINUED
00032
3. Open door (Figure 7, Item 2) (TM 5-2410-241-10).
N OT E
Transmission filter shown removed for clarity.
4. Remove protective cap (Figure 7, Item 3) from fitting (Figure 7, Item 6).
5. Remove protective cap (Figure 7, Item 4) from fitting (Figure 7, Item 5).
6. Connect 177-7861 hose (Figure 7, Item 8) coming from implement pump discharge pressure port (Figure 7,
Item 9) to fitting (Figure 7, Item 6).
7. Connect 177-7862 hose (Figure 7, Item 7) coming from signal pressure port (Figure 7, Item 1) to fitting
(Figure 7, Item 5).
Figure 7. Test Equipment Installation.
0032
0032-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.