TM 5-2410-241-23-2
0116
INSTALLATION CONTINUED
4. Install new O-ring (Figure 8, Item 5), cap (Figure 8, Item 2), three washers (Figure 8, Item 4) and bolts
(Figure 8, Item 3) on drive assembly (Figure 8, Item 1).
Figure 8. Axle Cap.
0116
END OF TASK
FOLLOW-ON TASKS
000116
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE