• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Sensor Adjustment.
TORQUE CONVERTER RELIEF VALVE SERVICE

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  575    576    577    578    579  580  581    582    583    584    585  
img
.
TM 5-2410-241-23-2
0122
ADJUSTMENT CONTINUED
N OT E
Install electrical connections as noted during removal.
8. Connect connector (Figure 6, Item 3) on connector (Figure 6, Item 1).
9. Install new tiedown strap (Figure 6, Item 2) on connector (Figure 6, Item 1).
Figure 6. Harness Connector.
0122
END OF TASK
FOLLOW-ON TASKS
000122
1. Install front floor plate (WP 0230).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0122-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.