• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Track Separation.
Figure 7. Track Blocking.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  604    605    606    607    608  609  610    611    612    613    614  
img
.
TM 5-2410-241-23-2
0127
INSTALLATION
000127
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure
to follow this warning may cause injury or death to personnel.
N OT E
Track weighs approximately 5,750 lb (2,600 kg).
1. Install lifting device to upper track (Figure 6, Item 1).
2. Align track to rollers and pull track (Figure 6, Item 1) on from front or back of machine.
N OT E
Track should be firmly against blocking.
3. Install blocking (Figure 6, Item 3) on lower track (Figure 6, Item 1).
4. Using lifting device, install upper track (Figure 6, Item 1) on final drive (Figure 6, Item 2).
5. Turn final drive (Figure 6, Item 2) in reverse while supporting track (Figure 6, Item 1) with lifting device.
6. Connect track links (Figure 6, Item 4).
7. Remove lifting device from track (Figure 6, Item 1).
Figure 6. Track Connection.
0127
0127-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.