Figure 4. Receptacle and Battery Disconnect Switch Connections.
ALTERNATOR POWER CABLE REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  905    906    907    908    909  910  911    912    913    914    915  
img
. .
TM 5-2410-241-23-2
0162
INSTALLATION CONTINUED
11. Install battery disconnect switch (Figure 5, Item 3), two new lockwashers (Figure 5, Item 2), and nut (Figure 5,
Item 1) on front battery box cover (Figure 5, Item 4).
12. Install key (Figure 5, Item 5) in battery disconnect switch (Figure 5, Item 3).
13. Install receptacle cover (Figure 5, Item 7) on receptacle (Figure 5, Item 6).
Figure 5. Battery Disconnect Switch.
0162
END OF TASK
FOLLOW-ON TASKS
000162
1. Install front floor plates (WP 0230).
2. Install batteries (WP 0155).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0162-7/(8 blank)