• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Battery Disconnect Switch.
Figure 2. Cover.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  906    907    908    909    910  911  912    913    914    915    916  
img
. . . .
10
TM 5-2410-241-23-2
0163
FIELD MAINTENANCE
-
ALTERNATOR POWER CABLE REPLACEMENT
016
3
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 65)
Front floor plates removed (WP 0230)
0
0
Gloves, Rubber (S0208)
Batteries removed (WP 0155)
0
(WP 0302, Item 68)
Air cleaner hose removed (WP 0111)
0
0
Goggles, (S0209)
Drawing Required
(WP 0302, Item 68)
0
0
TM 5-2410-241-24P, Figure 11
0
Materials/Parts
0
Estimated Time to Complete
Rag, Wiping (WP 0303, Item 24)
0
0
5.5 Hr
Tag, Marker (WP 0303, Item 34)
0
0
Tiedown Strap (WP 0303, Item 36)
0
References
0
WP 0295
0
REMOVAL
000163
N OT E
Note cable routing to aid installation.
1. Remove nut (Figure 1, Item 3), washer (Figure 1, Item 4), and two clamps (Figure 1, Item 5) from alternator
cable (Figure 1, Item 1) and fuse panel cable (Figure 1, Item 2).
Figure 1. Clamps.
0163
0163-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.