• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. O-ring Installation.
Figure 19. Bulldozer Tilt Control Valve Manifold.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  251    252    253    254    255  256  257    258    259    260    261  
img
.
TM 5-2410-241-23-3
0212
ASSEMBLY CONTINUED
5. Install valve (Figure 17, Item 1) on manifold (Figure 17, Item 2).
Figure 17. Steering Control Valve Installation.
0212
N OT E
Install O-rings as noted during disassembly.
6. Install seven new O-rings (Figure 18, Item 2) on valve (Figure 18, Item 1).
7. Install valve (Figure 18, Item 1) on valve cap (Figure 18, Item 3).
Figure 18. Bulldozer Lift Control Valve Manifold.
0212
0212-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.