• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 22. Valve Bank Cover Installation.
Figure 24. Hose Installation.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  256    257    258    259    260  261  262    263    264    265    266  
img
.
TM 5-2410-241-23-3
0212
INSTALLATION
000212
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure to
follow this warning may cause injury or death to personnel.
N OT E
Valve bank weighs approximately 100 lb (45 kg).
1. Attach bracket link (Figure 23, Item 1) and lifting device to valve bank (Figure 23, Item 2).
2. Using lifting device, position valve bank (Figure 23, Item 2) on machine.
Figure 23. Bracket Link.
0212
0212-22


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.