Figure 19. Bulldozer Tilt Control Valve Manifold.
Figure 21. O-ring Installation.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  253    254    255    256    257  258  259    260    261    262    263  
img
.
TM 5-2410-241-23-3
0212
ASSEMBLY CONTINUED
N OT E
Install O-rings as noted during disassembly.
10. Install seven new O-rings (Figure 20, Item 2) on valve (Figure 20, Item 1).
11. Install valve (Figure 20, Item 1) on control valve assembly (Figure 20, Item 3).
Figure 20. Winch Control Valve Manifold.
0212
0212-19