• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Cover.
ACCESS COVER INSTALLATION

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  318    319    320    321    322  323  324    325    326    327    328  
img
.
TM 5-2410-241-23-3
0218
LOWERING EQUIPMENT PROCEDURE CONTINUED
1. Remove line (Figure 3, Item 2) and O-ring (Figure 3, Item 3) from elbow (Figure 3, Item 4). Discard O-ring.
2. Remove elbow (Figure 3, Item 4) and O-ring (Figure 3, Item 5) from ripper valve (Figure 3, Item 1). Discard O-
ring.
3. Remove bolt (Figure 3, Item 6) from cover (Figure 3, Item 7).
4. Insert bolt (Figure 3, Item 6) into ripper valve (Figure 3, Item 1) and slowly tighten bolt to lower ripper
attachment.
5. When ripper attachment is completely down, remove bolt (Figure 3, Item 6) from ripper valve (Figure 3,
Item 1).
6. Install new O-ring (Figure 3, Item 5) and elbow (Figure 3, Item 4) on ripper valve (Figure 3, Item 1).
7. Install new O-ring (Figure 3, Item 3) and line (Figure 3, Item 2) on elbow (Figure 3, Item 4) on blade valve
(Figure 3, Item 9). Discard O-ring.
8. Remove line (Figure 3, Item 2) and O-ring (Figure 3, Item 3) from elbow (Figure 3, Item 4) on blade valve
(Figure 3, Item 9). Discard O-ring.
9. Loosen jam nut (Figure 3, Item 6) and remove elbow (Figure 3, Item 4) and O-ring (Figure 3, Item 5) from blade
valve (Figure 3, Item 9). Discard O-ring.
10. Insert bolt (Figure 3, Item 7) into blade valve (Figure 3, Item 9) and slowly tighten bolt to lower blade.
11. When blade is completely down, remove bolt (Figure 3, Item 7) and return to cover (Figure 3, Item 8).
12. Install new O-ring (Figure 3, Item 5) and elbow (Figure 3, Item 4) on blade valve (Figure 3, Item 9).
13. Install new O-ring (Figure 3, Item 3) and tube nut (Figure 3, Item 2) on elbow (Figure 3, Item 4).
Figure 3. Valve Bank.
0218
END OF TASK
0218-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.