• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Counterbalance Valve Mounting.
Figure 4. Counterbalance Valve.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  314    315    316    317    318  319  320    321    322    323    324  
img
. .
TM 5-2410-241-23-3
0217
CLEANING AND INSPECTION
000217
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
INSTALLATION
000217
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure to
follow this warning may cause injury or death to personnel.
N OT E
Counterbalance valve weighs approximately 75 lb (35 kg).
1. Attach bracket link (Figure 3, Item 3) and lifting device on counterbalance valve (Figure 3, Item 2).
2. Using lifting device, install two O-rings (Figure 3, Item 5), counterbalance valve (Figure 3, Item 2), and six bolts
(Figure 3, Item 1) on motor (Figure 3, Item 4).
3. Remove lifting device and bracket link (Figure 3, Item 3) from counterbalance valve (Figure 3, Item 2).
Figure 3. Counterbalance Valve Mounting.
0217
0217-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.