• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL MANIFOLD SERVICE - Continued
Figure 1. Counterbalance Valve.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  311    312    313    314    315  316  317    318    319    320    321  
img
. . . . . . . . . . .
6
TM 5-2410-241-23-3
0217
FIELD MAINTENANCE INSTRUCTIONS
-
COUNTERBALANCE VALVE SERVICE
0217
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0295
0
(WP 0302, Item 65)
Equipment Condition
0
0
Bracket, Link (1-1/4 in.; 9,000 lb [4,000 kg])
Machine parked (TM 5-2410-241-10)
(WP 0302, Item 12)
0
0
Front floor plate removed (WP 0230)
Gloves, Rubber (S0208)
0
Rear floor plate removed (WP 0231)
(WP 0302, Item 68)
0
0
Lifting Device (500-lb capacity)
Hydraulic system pressure released
0
(WP 0186)
Materials/Parts
0
0
Hydraulic system drained (WP 0184)
0
Cap Set, Protective (WP 0303, Item 4)
0
Drawing Required
Rag, Wiping (WP 0303, Item 24)
0
0
TM 5-2410-241-24P, Figure 78
Tag, Marker (WP 0303, Item 34)
0
0
O-ring (2)
Estimated Time to Complete
0
0
Personnel Required
5.0 Hr
0
0
Two
0
0217-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.