TM 5-2410-241-23-3
0237
ASSEMBLY CONTINUED
28. Install wire loom (Figure 35, Item 2) and new tiedown straps (Figure 35, Item 1) on wiring harness (Figure 35,
Item 3).
29. Install two retainers (Figure 35, Item 5), collar (Figure 35, Item 6), and bearing (Figure 35, Item 7) on shaft
(Figure 35, Item 4).
Figure 35. Shaft and Collar.
0237