• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Ripper Frame.
Figure 4. Tiedown Plate.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  867    868    869    870    871  872  873    874    875    876    877  
img
. .
TM 5-2410-241-23-3
0279
REMOVAL CONTINUED
N OT E
Note orientation of tiedown plate to aid installation.
9. Remove two bolts (Figure 3, Item 5), plates (Figure 3, Item 4), spacers (Figure 3, Item 3), tiedown plate
(Figure 3, Item 2), upper pivot pin (Figure 3, Item 6), and shims (Figure 3, Item 1) from ripper mounting (Figure
3, Item 7).
10. Repeat step 9 for other side of ripper mounting (Figure 3, Item 7).
Figure 3. Tiedown Plate.
0279
END OF TASK
CLEANING AND INSPECTION
000279
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0279-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.